GameSpot may receive revenue from affiliate and advertising partnerships for sharing this content and from purchases through links.

Lego Universe construction delayed

NetDevil-developed MMOG based on Danish building-block toys no longer expected to arrive in 2009; no new release window announced.

23 Comments

The Lego Group has enjoyed ample success with its line of Traveller's Tales-developed, Warner Bros. Interactive-published Lego games. However, the entertainment factor of those games relies on the tongue-in-cheek handling of the licensed properties, and not so much the hallmark fundamentals of Lego building-block construction.

No Caption Provided

That approach will change with Lego Universe, the NetDevil-developed massively multiplayer online game devoted to the toy. Unfortunately, Lego purists will have to tide themselves over with the tangible toys longer than previously anticipated, because the Lego Group today announced that its family-friendly MMOG will not launch this year.

"Previously scheduled for 2009, the launch of Lego Universe has been delayed due to strategic optimization within The Lego Group," a Lego Group representative confirmed for GameSpot. "We are in a fortunate position of having many outstanding product launches scheduled for 2009, and have therefore made a decision to postpone the release of Lego Universe."

As described by Lego VP of business development Henrik Lorenson at last year's Leipzig Game Developers Conference, Lego Universe will give players a ranging variety of building blocks to create their own constructions. Players will also be able to create and share their own minigames using the virtual Lego bricks, and Lorenson said the game's ultimate goal would be for gamers to develop their own Lego-built worlds.

The Lego Group did not reveal an updated release window for Lego Universe. However, a representative did tell GameSpot that the in-development MMOG will be shown in greater detail at this year's Game Developers Conference, which runs from March 23-27 in San Francisco.

Got a news tip or want to contact us directly? Email news@gamespot.com

Join the conversation
There are 23 comments about this story
23 Comments  RefreshSorted By 
GameSpot has a zero tolerance policy when it comes to toxic conduct in comments. Any abusive, racist, sexist, threatening, bullying, vulgar, and otherwise objectionable behavior will result in moderation and/or account termination. Please keep your discussion civil.

Avatar image for Killingspree303
Killingspree303

799

Forum Posts

0

Wiki Points

0

Followers

Reviews: 6

User Lists: 0

@diggyman LEGO and Marvel... That would've made a horrible combination. LEGO and Marvel are two completely different companies. LEGO is a toy company, and Marvel is a comic book company. And by the way, the best LEGO game ever created is LEGO racers 1. No doubt about that.

Upvote • 
Avatar image for diggyman
diggyman

777

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

I think LEGO should link up with the MARVEL UNIVERSE... Imagine that...

Upvote • 
Avatar image for armynavy123
armynavy123

76

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

*$% I am going to scram!! %^$#&^ you lego!

Upvote • 
Avatar image for CanalNoises
CanalNoises

25

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

Tonicmole (and wahyudil), it's obviously the combination of the two that made it successful. LEGO was the world's 4th largest toy company last I heard. Combining Star Wars with one of the world's most popular toys is what made it good. "That's why there is a huge Convention cirtcuit for Star Wars,....not Lego." There's actually three LEGO conventions in the US alone- BrickFest, BrickWorld, and BrickCon.

Upvote • 
Avatar image for wahyudil
wahyudil

836

Forum Posts

0

Wiki Points

0

Followers

Reviews: 6

User Lists: 0

I think Lego Star Wars was successful because of Star Wars......not Lego..... agree with that ...

Upvote • 
Avatar image for S2333
S2333

1096

Forum Posts

0

Wiki Points

0

Followers

Reviews: 1

User Lists: 0

I like this idea. I want to see how it turns out.

Upvote • 
Avatar image for CoricidinDXM
CoricidinDXM

45

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

are u serious tonicmole? The Lego trademark is just as popular as the star wars franchise. Lego has it's own freakin amusement park for god's sake, something star wars does not have.

Upvote • 
Avatar image for jrabbit99
jrabbit99

2836

Forum Posts

0

Wiki Points

0

Followers

Reviews: 6

User Lists: 0

I haven't seen a lego game in years

Upvote • 
Avatar image for tonicmole
tonicmole

275

Forum Posts

0

Wiki Points

0

Followers

Reviews: 19

User Lists: 0

Ummmm, I think Lego Star Wars was successful because of Star Wars......not Lego. That's why there is a huge Convention cirtcuit for Star Wars,....not Lego.

Upvote • 
Avatar image for turb06
turb06

103

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

the concept sounds very good if you can infact build your own city from lego, but i cant see a lego MMO dragging the hardcore away from games like WoW and will it be to difficult for the little ones to grasp the concept. I wait in anticipation as i love lego. Have quite a few of the massive star wars kits.

Upvote • 
Avatar image for ChristopherPB
ChristopherPB

25

Forum Posts

0

Wiki Points

0

Followers

Reviews: 2

User Lists: 0

You could always play Blockland while you wait....

Upvote • 
Avatar image for enix165
enix165

1848

Forum Posts

0

Wiki Points

0

Followers

Reviews: 6

User Lists: 0

@Superdude475:The amount of Legos you can get from this game is definitely cheaper than getting actual Lego sets, trust me. XD A small set(And I'm talking three Star Wars people and a hoverbike or something) is $15, and they go way up from there. There was some $400 sets, last time I checked(mind you, they're like 3000 pieces, but still...XD)...

Upvote • 
Avatar image for SuperGamer911
SuperGamer911

253

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

Now I have to wait until 2010 :(

Upvote • 
Avatar image for Superdude475
Superdude475

1887

Forum Posts

0

Wiki Points

0

Followers

Reviews: 9

User Lists: 0

Why not just build with real legos? If you want to have massive lego battles just get a handful and throw them a little kids.

Upvote • 
Avatar image for Flat_Line_____
Flat_Line_____

1450

Forum Posts

0

Wiki Points

0

Followers

Reviews: 1

User Lists: 0

For those that haven't heard of it before there is a website here << LINK REMOVED >> That lets you build and create pretty much whatever you want. It is also free, Kinda reminds me more of Mega blocks than legos but there is a online community that you can play with in in-game servers with mods and all other kinds of custom playtypes. It's actually pretty fun at times.

Upvote • 
Avatar image for -Squirrel-
-Squirrel-

494

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

AstroChimp83, I guess you'll have to settle for building more phallic stages in Smash Bros Brawl.

Upvote • 
Avatar image for AstroChimp83
AstroChimp83

134

Forum Posts

0

Wiki Points

0

Followers

Reviews: 3

User Lists: 0

I didn't even know this was in the works but I'm bummed that it's on hold... Now how am I supposed to build giant phallic objects for all the world to see?

Upvote • 
Avatar image for GodsPoison
GodsPoison

15256

Forum Posts

0

Wiki Points

0

Followers

Reviews: 1

User Lists: 0

Put it on ps360, then we can all build crazy contraptions and have massive lego wars!..............Please?

Upvote • 
Avatar image for enix165
enix165

1848

Forum Posts

0

Wiki Points

0

Followers

Reviews: 6

User Lists: 0

O_O They were making this? Aw, I never even knew...and Daabulls23, they made that already. It's called Lego Digital Designer. It's been out for a LONG time...XD I'm pretty sure you can get it free from the main site...

Upvote • 
Avatar image for daabulls23
daabulls23

1223

Forum Posts

0

Wiki Points

0

Followers

Reviews: 3

User Lists: 0

Legos are awesome. I've always thought it would be cool if they would come out with a program where you could design any kind of set with all kinds of pieces available.

Upvote • 
Avatar image for Darth_Nater307
Darth_Nater307

924

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

Crud. And I was looking forward to this one too :(

Upvote • 
Avatar image for hbnmrsmiley
hbnmrsmiley

76

Forum Posts

0

Wiki Points

0

Followers

Reviews: 1

User Lists: 0

i love legos. this could be fun as long as there's an actual purpose and plot aside from just building stuff.

Upvote • 
Avatar image for DarkEclipse533
DarkEclipse533

468

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

sounds interesting

Upvote •