Xbox repair time from arrival at service center

This topic is locked from further discussion.

Avatar image for generalbigmac
generalbigmac

29

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

#1 generalbigmac
Member since 2008 • 29 Posts
I was just wondering how long it takes to get your xbox360 back from the service center. It took me about a week to get it to the service center and i was wondering if anybody could help me out and tell me how long it will take. My xbox got the RRoD and i'm receiving a new xbox. What is the average time period i will be looking at?
Avatar image for brothersinarmsb
brothersinarmsb

238

Forum Posts

0

Wiki Points

0

Followers

Reviews: 1

User Lists: 0

#3 brothersinarmsb
Member since 2007 • 238 Posts

my took 5 weeks. it usally takes 3-5 weeks. if u get in 3 weeks you must be really lucky.

Avatar image for pooolk
pooolk

251

Forum Posts

0

Wiki Points

0

Followers

Reviews: 0

User Lists: 0

#4 pooolk
Member since 2005 • 251 Posts

2 weeks or 3